Dr. rer. nat. Manfred Mittler
Jul 1992 - Dec 1996
Dissertation:
The Variability of Cycle Times in Semiconductor Manufacturing
Publications
2007[ to top ]
-
Discrete-time approximation of the machine interference problem with generally distributed failure, repair, and walking times in European Journal of Control (2007). 3 254–267.
1997[ to top ]
-
Approximate Flow Time Distribution of a Queue with Batch Service (1997).
-
On cycle times and interdeparture times in semiconductor manufacturing in Informs Fall 1997 (1997).
-
The Variability of Cycle Times in Semiconductor Manufacturing PhD thesis, University of Wuerzburg. (1997, January).
1996[ to top ]
-
Two-moment analysis of alternative tool models with random breakdowns (1996).
-
Two-moment analysis of alternative tool models with random breakdowns in IEEE International Conference on Emerging Technologies and Factory Automation (ETFA ’96) (1996).
-
Discrete-time approximation of the machine interference model with generally distributed failure, repair, and walking times in Rensselare’s 5th International Conference Computer Integrated Manufacturing and Automation Technology 1996 (CIMAT ’96), C. Foulard and R. David, editors (1996). 236–241.
1995[ to top ]
-
Moment approximation in product form queueing networks (1995).
-
On the approximation of higher moments in open and closed fork/join primitives with limited buffers in Symposium on Operations Research (SOR ’95), P. Kleinschmidt, A. Bachem, U. Derigs, D. Fischer, U. Leopold-Wildburger, R. Möhring, editors (1995). pp. 113–118.
-
Autocorrelation of cycle times in semiconductor manufacturing systems (1995).
-
Reducing the variance of cycle times in semiconductor manufacturing systems (1995).
-
On cycle times and interdeparture times in semiconductor manufacturing (1995).
-
On the approximation of higher moments in open and closed fork/join primitives with limited buffers (1995).
-
Discrete-time approximation of the machine repairman model with generally distributed failure, repair, and walking times (1995).
-
Set management: Minimizing synchronization delays of prefabricated parts before assembly in Proceedingsof the Winter Simulation Conference 1995, C. Alexopolous, K. Kang, W. R. Lilegdon and D. Goldsman, editors (1995). pp. 829–836.
-
Set management: Minimizing synchronization delays of prefabricated parts before assembly (1995).
-
Reducing the variance of cycle times in semiconductor manufacturing systems in International Conference on Improving Manufacturing Performance in a Disributed Enterprise: Advanced Systems and Tools (1995). pp. 89–98.
-
Autocorrelation of cycle times in semiconductor manufacturing systems in Proceedingsof the Winter Simulation Conference 1995, C. Alexopolous, K. Kang, W. R. Lilegdon and D. Goldsman, editors (1995). pp. 865–872.
1994[ to top ]
-
Entwicklung von due-date Warteschlangendisziplinen zur Optimierung von Produktionssystemen (1994).
-
Sojourn time distribution of the asymmetric M/M/1//N-system with LCFS-PR service (1994).
1993[ to top ]
-
Analysis of two finite queues coupled by a triggering scheduler in Messung, Modellierung und Bewertung von Rechen- und Kommunikationssystemen. Kurzberichte und Werkzeugvorstellungen, B. Walke and O. Spaniol, editors. 7. ITG/GI-Fachtagung (1993). pp. 136–145.
-
Analysis of two finite queues coupled by a triggering scheduler (1993).
-
Reducing the variance of sojourn times in queueing networks with overtaking (1993).
-
Performance of a neural net scheduler used in packet switching interconnection networks in Int. Conf. on Neural Networks (1993).
-
Artificial neural net applications in telecommunication systems in Neural Computing & Applications (1993). 1 124–146.
1992[ to top ]
-
Performance of a neural net scheduler used in packet switching interconnection networks (1992).
-
Artificial neural net applications in telecommunication systems (1992).